Zone has completed installation of a ZAS arena in Wyoming on the outskirts of Cheyenne. Although the client decided to do the painting and artwork themselves, and hence as yet we have no pictures of the final look and feel, you get the concept of the arena from the following photos taken during installation.
The arena was 3,600 sq. ft. and approximately square in shape. The client is using some of our DMX lighting poles as can be seen in some of the images.
For this job we prepared and shipped all the metal work ahead of time, and the only work on site was shaping of the walls and assembly and wiring of the interactive arena. Total time to install in this instance 4 days 3 people.

Additional lighting effects were provided by the client as seen below, we recommended LED lighting effects for the balance of the lighting to reduce on going maintenance costs.

Here we see part of the installation team hard at work :)

Painting services are available, we can even ship the arena out ready to bolt together on site as a kit D.I.Y. furniture assembly style.

Here is another look at the excellent tower lighting DMX effect, it really makes the arena POP!

Z.A.S. arenas are a cost effective solution for part or all of your arena needs. Call Simon @ 1-877-454-1607 for more information on our arena services
|